|
The
swimming pool at Windsor Castle has been heated by
Ecotubes for the last 7 years. For this project the
panels were installed on an A-frame to directly replace
a previous flat plate system which had deteriorated
after only 7 years. The Riomay Ecotubes still look as
good as new and have another 25-30 years' expected life
in them.
|